A sled is pulled along level snow by a rope that exerts a constant force directed…

PHYSICS · Single correct · A Level · Physics · Mechanics and materials · Mechanics and materials

Problem

A sled is pulled 20 m20\,\text{m} along level snow by a rope that exerts a constant 50 N50\,\text{N} force directed 30∘30^{\circ} above the horizontal. Determine the work done on the sled by the rope. (a) 5.0×102 J5.0\times10^{2}\,\text{J} (b) 1.0×103 J1.0\times10^{3}\,\text{J} (c) 8.7×102 J8.7\times10^{2}\,\text{J} (d) −8.7×102 J-8.7\times10^{2}\,\text{J}

Related theory

Browse the problem library