Problem

A crane must do 24 kJ24\,\text{kJ} of work to lift a load. It supplies 1 kW1\,\text{kW} of power for the first 15 s15\,\text{s}, after which the power decreases to 600 W600\,\text{W} for the rest of the lift. What is the total time taken to complete the task? (a) 24 s24\,\text{s} (b) 35 s35\,\text{s} (c) 30 s30\,\text{s} (d) 25 s25\,\text{s}