PHYSICS · Multi-part · A Level · Physics · Mechanics and materials · Mechanics and materials
Problem
A boy pulls a sled along a straight, level path using a rope that always exerts a constant tension of 40N.
(i) The boy first pulls the sled forward for 15m with the rope making an angle of 30∘ with the direction of motion. Calculate the work done in this part of the trip.
(ii) He then pulls the sled back along the same line for 6m while the rope now makes an angle of 120∘ with the direction of motion. Calculate the work done in this second part.
(iii) Find the total work done by the boy on the sled for the entire out-and-back motion.