At a construction site a hoist performs two lifts without a pause between them
PHYSICS · Multi-part · A Level · Physics · Mechanics and materials · Mechanics and materials
Problem
At a construction site a hoist performs two lifts without a pause between them.
First, it raises a 400kg pallet of bricks through 15m in 20s.
Immediately afterwards, it raises a 600kg pallet through 10m in 25s.
Take g=9.8ms−2.
(i) Compute the total mechanical work done by the hoist in the two lifts.
(ii) Find the total time taken for both lifts.
(iii) Calculate the average power output of the hoist over the entire operation and express your answer in horsepower (1hp=746W).