When a block slides a certain distance down an incline

PHYSICS · Single correct · A Level · Physics · Mechanics and materials · Mechanics and materials

Problem

22. When a block slides a certain distance down an incline, the work done by gravity is 300 J . What is the work done by gravity if this block slides the same distance up the incline? (A) 300 J (B) Zero (C) -300 J (D) It cannot be determined without knowing the distance the block slides. (E) It cannot be determined without knowing the coefficient of friction.

Related theory

Browse the problem library