MATHEMATICS · Single correct · A Level · Mathematics · Integration · Integration
Problem
A manufacturing process operates for 10 hours. Its production rate r(t) (in units per hour) behaves as follows:
• Increases linearly from 0 at t=0 to a maximum rate H at t=2 hours.
• Remains constant at H from t=2 to t=7 hours.
• Decreases linearly from H at t=7 hours to 0 at t=10 hours.
If the total number of units produced during the shift is 160, what is the value of H?
(a) 7160 units per hour
(b) 20 units per hour
(c) 364 units per hour
(d) 16 units per hour