A surveying team fixes the position of a sensor in a tunnel using three…
PHYSICS · Multi-part · Fermi University Physics · Mathematical Methods for Physics · Linear algebra and vector spaces · Tensors and differential geometry
Conditions of Validity, Ch A coordinate system is a map: the metric, the scale factors and where a chart fails
Problem
A surveying team fixes the position of a sensor in a tunnel using three non-orthogonal rods anchored at the origin, giving the basis e1=(1.0,0,0)m, e2=(0,1.0,0)m, e3=(1.0,0,1.0)m.
((a)) Construct the reciprocal basis ei using e1=(e2×e3)/V, e2=(e3×e1)/V, e3=(e1×e2)/V with V=e1⋅(e2×e3).
((b)) The sensor is at r=(2.0,3.0,5.0)m. Write r=ciei and find c1,c2,c3.