A reactor generating of thermal power is shut down after long operation at full power
PHYSICS · Multi-part · Fermi University Physics · Nuclear Physics · Fission, fusion and nuclear energy · Fission, fusion and nuclear energy
The Nucleus Resolved, Ch The reactor as a field equation: diffusion, criticality, feedback and burn-up
Problem
A reactor generating 1200MW of thermal power is shut down after long operation at full power. The residual fission-product decay heat follows P0P(t)≈0.066t−0.2, with t in seconds, valid from about a minute to a month after shutdown.
((a)) Estimate the reactor's thermal power one day (t=86400s) after shutdown.
((b)) Estimate it one week (t=604800s) after shutdown.