Combined work problems

Two painters, two taps, two typists — whenever more than one worker shares a single job, the everyday instinct is to average their times. That instinct is wrong, and knowing exactly why is one of the sharpest proportional-reasoning skills a Class 8 student can own. The fix is small but powerful: stop thinking in days and start thinking in the fraction of the job done per day — the work rate. Rates add when people work together; days never do. This idea sits directly inside the CBSE "Proportional Reasoning-2" chapter, where workers-and-days problems are a standard inverse-proportion context: more workers means less time, in exact inverse proportion. Master the rate trick here and the same reasoning carries into taps filling and draining a tank, pipes, and any "how long together" question you will meet through Class 10 and beyond.

The core insight

Convert "days to finish alone" into "fraction of the job done per day," add the individual rates to get the combined rate, then take the reciprocal of that sum to find the time taken together.

The core idea

Work problems feel like speed problems in disguise, and the disguise is deliberate — the same inverse-proportion habit that governs "more workers, fewer days" governs "faster combined rate, less combined time."

Rate, not days, is the additive quantity. If a person finishes a job alone in nn days, they complete a constant fraction of the job every day:

rate=1n of the job per day\text{rate} = \dfrac{1}{n} \text{ of the job per day}

where: nn is the number of days one person alone needs, and the rate is a fraction of one whole job completed in one day — never a number of days itself.

Rates add when people work together. If Person A alone takes aa days and Person B alone takes bb days, working together their daily output simply sums:

combined rate=1a+1b\text{combined rate} = \dfrac{1}{a} + \dfrac{1}{b}

where: aa and bb are the individual times alone (in days), and the combined rate is the fraction of the job the pair finishes together in one day.

Time is the reciprocal of the combined rate. If the combined rate equals 1T\dfrac{1}{T}, then the whole job — one complete unit of work — takes

T=11a+1b=aba+b daysT = \dfrac{1}{\dfrac{1}{a}+\dfrac{1}{b}} = \dfrac{ab}{a+b} \text{ days}

where: TT is the number of days needed when both work together, and aba+b\dfrac{ab}{a+b} is the same relation written as a single fraction after combining 1a+1b\dfrac{1}{a}+\dfrac{1}{b}. The pattern extends to any number of workers or machines: with individual rates 1a,1b,1c,…\dfrac{1}{a}, \dfrac{1}{b}, \dfrac{1}{c}, \dots, the combined daily rate is their sum, and the time taken together is the reciprocal of that sum. This is exactly the inverse-proportion logic of the syllabus — the amount of work is a fixed constant, so increasing the rate (more hands on deck) proportionally shrinks the time.

Figure
Two bars showing individual daily work fractions of one twelfth and one eighth stacking into a combined bar of five twenty fourths per day
Work rates add: fraction of the job done in one day Ravi alone 1/12 per day Meena alone 1/8 per day together 5/24 per day + Reciprocal of combined rate = time taken together T = 24 / 5 = 4.8 days Add rates, never average the days — 12 and 8 do not average to 4.8

Derivation of the combined-time formula

Derivation ACombined time from two individual times

The goal is to show, purely from the definition of "rate as fraction of the job per day" and the algebra of adding two fractions, that two people who alone take aa days and bb days will together finish the job in exactly T=aba+bT = \dfrac{ab}{a+b} days, and that this single compact formula is nothing more than a reciprocal of a sum in disguise, so it never needs to be memorised separately from the two-step add-then-flip method.

Step 1. Write each person's daily output as a fraction of the whole job. Person A alone needs aa days, so in one day A completes 1a\dfrac{1}{a} of the job; Person B alone needs bb days, so B completes 1b\dfrac{1}{b} of the job in one day. These are the two work rates, each a pure fraction of "one job," with no reference to a physical unit like bricks or pages — that is exactly why they can be added while raw days cannot.

Step 2. Add the two rates to get the combined daily output. Working together on the same job, in one day A contributes 1a\dfrac{1}{a} and B contributes 1b\dfrac{1}{b} of the total, so together they complete 1a+1b\dfrac{1}{a} + \dfrac{1}{b} of the job in that day. Using the common denominator abab, this sum is bab+aab=a+bab\dfrac{b}{ab} + \dfrac{a}{ab} = \dfrac{a+b}{ab}.

Step 3. Take the reciprocal to convert the daily fraction back into a time. If the pair completes a+bab\dfrac{a+b}{ab} of the job each day, then completing the whole job (one full unit of work) takes TT days where T×a+bab=1T \times \dfrac{a+b}{ab} = 1, so T=aba+bT = \dfrac{ab}{a+b} days — exactly the reciprocal of the combined rate found in Step 2.

Step 4. Confirm the formula matches the "add, then flip" method directly: 1T=1a+1b\dfrac{1}{T} = \dfrac{1}{a}+\dfrac{1}{b} rearranges to T=11a+1b=aba+bT = \dfrac{1}{\frac{1}{a}+\frac{1}{b}} = \dfrac{ab}{a+b}, so the single-formula shortcut and the step-by-step rate method are the same algebra, and either is acceptable in an exam as long as the reasoning (rates add, then reciprocate) is shown.

Worked example

Ravi can paint a fence alone in 1212 days. Meena can paint the same fence alone in 88 days. If they work together, how many days will they take?

Step 1. Find each rate. Ravi: 112\dfrac{1}{12} of the fence per day. Meena: 18\dfrac{1}{8} of the fence per day.

Step 2. Add the rates using the LCM of 1212 and 88, which is 2424: 224+324=524\dfrac{2}{24} + \dfrac{3}{24} = \dfrac{5}{24} of the fence per day, together.

Step 3. Take the reciprocal: T=1524=245=4.8T = \dfrac{1}{\frac{5}{24}} = \dfrac{24}{5} = 4.8 days. Together, Ravi and Meena finish the fence in 4.8 days (about 44 days and 19.219.2 hours). Check: in 4.84.8 days Ravi does 4.812=0.4\dfrac{4.8}{12}=0.4 of the job and Meena does 4.88=0.6\dfrac{4.8}{8}=0.6; 0.4+0.6=10.4+0.6=1, the whole job. ✓

Competitive stretch

AA and BB together complete a task in 66 days; AA alone takes 1010 days. How many days would BB take alone?

Step 1. Combined rate: 16\dfrac{1}{6} of the job per day. Step 2. AA's rate alone: 110\dfrac{1}{10} per day. Step 3. Subtract to isolate BB's rate: 16−110=530−330=230=115\dfrac{1}{6}-\dfrac{1}{10} = \dfrac{5}{30}-\dfrac{3}{30} = \dfrac{2}{30} = \dfrac{1}{15}. Step 4. BB's rate is 115\dfrac{1}{15} of the job per day, so BB alone takes 15 days. Check: 110+115=330+230=530=16\dfrac{1}{10}+\dfrac{1}{15} = \dfrac{3}{30}+\dfrac{2}{30} = \dfrac{5}{30} = \dfrac{1}{6} ✓.

Common traps

  • Averaging the days instead of adding the rates. 1212 days and 88 days do not average to the combined time; add 112+18\dfrac{1}{12}+\dfrac{1}{8}, never 12+82\dfrac{12+8}{2}.
  • Forgetting the final reciprocal. The sum of rates gives work done per day; the time taken is the reciprocal of that sum, not the sum itself.
  • Skipping a common denominator. Adding or subtracting the fractions without first finding the LCM of the individual times leads straight to a wrong combined fraction.
  • Adding a rate that should be subtracted. When one agent works against the others (for example a leak draining a tank the others are filling), that rate must be subtracted, not added — the "work backward" example above uses the same subtraction logic to find a missing individual time.

Ask the tutor: Want to try a three-worker combined-work problem, or one where a tap fills a tank while a leak drains it?

Why can we not just average 12 days and 8 days to get the combined time

Averaging treats days as if they add up directly, but a "day" is not a fixed chunk of work — it means different amounts for different people. Ravi's day is worth one twelfth of the fence and Meena's day is worth one eighth, a bigger chunk. Only the fractions of work per day are directly comparable and addable, because each is measured against the same whole job. Once you add those fractions and flip the result, you automatically get a time between the two individual times but weighted correctly, which is why together-time is always less than the faster worker's alone-time, not a simple midpoint.

Does the combined-time formula T equals ab over a plus b work for three or more workers

Not directly as written, because that compact form comes from adding exactly two fractions. The underlying method scales perfectly though: add every individual rate, one over a, one over b, one over c and so on, to get the combined daily rate, then take the reciprocal of that sum for the total time. If you insist on a single formula for three workers it becomes messier, so it is safer and clearer in an exam to always go through the rate-then-reciprocal steps rather than memorise a bigger formula.

What if one person stops working partway through the job

Then you track work done in stages using the same fraction-per-day idea. Suppose both work together for some days, contributing their combined rate each day, and then one person continues alone. Add up the fraction of the job completed in each stage and set the total equal to 11 (the whole job) to solve for the unknown time. This is a natural extension of the same "fractions of work add up to one whole job" principle used in the worked examples, just applied over more than one stage.

Before this

Where this leads